PEMBUATAN ALAT UJI AC JENIS SPLIT ½ PK DENGAN PENAMBAHAN WATER HEATER

Riza M. Yunus, Engkos Koswara, Ferry Aji Anggriawan

Abstract


One of the important components in the process of making the test equipment is the frame construction. The frame construction acts as a support as well as a holder for the other components of the testing instrument. The heat energy that is disposed of into the environment by the AC system ½ PK is wasted without being used. So that heat energy is not wasted, the addition of a waterheater is done which will be installed on the ½ PK split AC and placed between the compressor and the condenser. The method used in the process of making frame construction is by welding. Welding is where materials of the same or different types are combined into one. frame dimensions 1100 X 500 X 1750 mm steel material st 37.

 

Keywords: construction, frame, waterheater, manufacture.


Full Text:

PDF


DOI: http://dx.doi.org/10.31949/j-ensitec.v7i01.2877

Refbacks

  • There are currently no refbacks.




Copyright (c) 2021 J-ENSITEC

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

Journal of Engineering and Sustainable Technology (J-ENSITEC) Published by Fakultas Teknik Universitas Majalengka (Print ISSN : 2407-6007 and Online ISSN: 2477-359X)

 

 

Visitor Number :

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.