ANALISIS EVALUASI BIAYA DAN PENJADWALAN WAKTU PROYEK PENGOLAHAN LIMBAH PT. KI DENGAN PENDEKATAN PERT

M. Imron Mas’ud, Erik Wijayanti

Abstract


Development industry now is significant so must be balance with waste treatment. The project waste treatment must be always control, so that the project activities are less effective and efficient, it will result in delays, decreasing the quality of work, and the swelling of implementation costs, one of which is a waste treatment project. This study aims to find out the evaluation of project scheduling and waste processing project cost by Project Evaluation Review Technique (PERT) approach either in manual calculation or POM software assistance. The results obtained that the waste processing project in PT. KI can be completed within 91 days and the critical path lies in the begin activity from A-B-C-E-H-J-K until L with the likelihood of completion of at least 85 days is 2.5%, most likely to be completed 91 days is 95% and no later than 96 days is 2.5%.


Keywords: PERT, Scheduling time, cost, waste treatment.


Keywords


PERT, Scheduling time, cost, waste treatment.

Full Text:

PDF


DOI: http://dx.doi.org/10.31949/j-ensitec.v3i2.644

Refbacks

  • There are currently no refbacks.




Copyright (c) 2017 J-ENSITEC

Journal of Engineering and Sustainable Technology (J-ENSITEC) Published by Fakultas Teknik Universitas Majalengka (Print ISSN : 2407-6007 and Online ISSN: 2477-359X)

 

 

Visitor Number :

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.