|
Issue |
Title |
|
Vol 4, No 01 (2017): November 2017 |
APLIKASI TUNTUNAN SIFAT SHALAT NABI MUHAMMAD SAW PADA MOBILE SMARTPHONE DAN TABLET PC BERBASIS ANDROID |
Abstract
PDF
|
Tri Ferga Prasetyo, Lutfi Mubarak, Agung Subagja |
|
Vol 7, No 01 (2020): NOVEMBER 2020 |
AUGMENTED REALITY TARI JAIPONG |
Abstract
PDF
|
Ade Bastian, Dony Susandi, Sidik Zapar Sidik |
|
Vol 1, No 01 (2014): November 2014 |
AUTOMATISASI PROCESSING EQUIPMENT DENGAN MENGGUNAKAN PLC PADA MESIN BUBUT KONVENSIONAL (BV – 20) |
Abstract
PDF
|
Dony Susandi, Tito Widianto |
|
Vol 3, No 2 (2017): Mei 2017 |
EKSPLORASI APLIKASI PUSH TO TALK PADA MOBILE PHONE |
Abstract
PDF
|
Deffy Susanti |
|
Vol 4, No 02 (2018): MEI 2018 |
EVALUASI KINERJA JARINGAN IRIGASI WILAYAH KADIPATEN UNTUK MENINGKATKAN EFEKTIVITAS DAN EFISIENSI PENGELOLAAN AIR IRIGASI |
Abstract
PDF
|
Abdul Kholiq, Maulana Aziz, Arief Rijaludin, Lia Lailla Nurjamilah |
|
Vol 5, No 01 (2018): NOVEMBER 2018 |
IMPLEMENTASI DAN PENGUJIAN APLIKASI PENILAIAN UJIAN ESSAY |
Abstract
PDF
|
Ade Bastian, Harun Sujadi |
|
Vol 4, No 01 (2017): November 2017 |
IMPLEMENTASI SISTEM INFORMASI MANAJEMEN PETERNAK AYAM PADA KOPERASI SINAR MULYA |
Abstract
PDF
|
Ade Bastian, Tri Ferga Prasetyo, Nia Kurniati |
|
Vol 6, No 01 (2019): NOVEMBER 2019 |
INOVASI MIKROKONTROLLER ARDUINO UNO R3 MENGGUNAKAN LIGHT TRAP DAN ULTRASONIC WAVE UNTUK PENGENDALIAN HAMA SERANGGA PADA TANAMAN PADI (ORYZA SATIVA L.) BERTENAGA SOLAR CELL (STUDI KASUS : DESA SILIHWANGI) |
Abstract
PDF
|
Ii Sopiandi, Ardi Mardiana, Enceng Enda Suhada |
|
Vol 4, No 01 (2017): November 2017 |
INOVASI MODEL PEMBELAJARAN PROBLEM BASED LEARNING DENGAN VISUALISASI VIRTUAL UNTUK MENINGKATKAN KETERAMPILAN PROSES SAINS |
Abstract
PDF
|
Eidelweis Dewi Jannati, Lia Milana |
|
Vol 6, No 01 (2019): NOVEMBER 2019 |
KAJI EKSPERIMEN PENGARUH VARIASI SUDUT DIES 12°, 15°, 18° TERHADAP HASIL PENARIKAN KAWAT TEMBAGA |
Abstract
PDF
|
Engkos Koswara, Riza M. Yunus, Azhar Fadhlurrahman |
|
Vol 6, No 02 (2020): MEI 2020 |
KAJI NUMERIK PROSES ALIRAN PADA POMPA HYDRAM MENGGUNAKAN ANSYS CFX |
Abstract
PDF
|
Nasim ., Engkos Koswara, Asep Rachmat |
|
Vol 2, No 01 (2015): November 2015 |
KAJIAN POTENSI ENERGI PADA SABO DAM CIBATU UNTUK PEMBANGKIT LISTRIK TENAGA MIKROHIDRO (PLTMH) DI KABUPATEN GARUT |
Abstract
PDF
|
Yayat Hendrayana |
|
Vol 2, No 01 (2015): November 2015 |
KAJIAN TERHADAP PRODUKTIVITAS DENGAN MEMPERTIMBANGKAN ASPEK KESELAMATAN DAN KESEHATAN KERJA KARYAWAN PADA KAWASAN INDUSTRI PERHOTELAN SANGKANHURIP KABUPATEN KUNINGAN |
Abstract
PDF
|
Otong Karyono, ER Ummi Kalsum |
|
Vol 2, No 02 (2016): Mei 2016 |
KEPUASAN NASABAH DIUKUR DARI KINERJA PELAYANAN DAN KINERJA KARYAWAN |
Abstract
PDF
|
Otong Karyono, Memen Parman |
|
Vol 4, No 01 (2017): November 2017 |
MEMBENTUK LOYALITAS PELANGGAN |
Abstract
PDF
|
Otong Karyono, Jefry Romdonny |
|
Vol 2, No 02 (2016): Mei 2016 |
MENGUKUR TINGKAT KEPUASAN MAHASISWA DALAM PEMBELAJARAN DENGAN MEMNGGUNKAN SISTEM PAKAR (Studi Kasus: Mahasiswa Teknik Informatika) |
Abstract
PDF
|
Dede Abdurahman, Tri Ferga Prasetyo |
|
Vol 2, No 02 (2016): Mei 2016 |
MODEL PEMBELAJARAN EXPERIENTIAL KOLB DENGAN VISUALISASI VIRTUAL UNTUK MENINGKATKAN PEMAHAMAN KONSEP MAHAMAHASISWA TEKNIK UNMA TEKNIK MESIN PADA MATA KULIAH FISIKA DASAR II MATERI LISTRIK |
Abstract
PDF
|
Eidelweis Dewi Jannati, Yudi Samantha |
|
Vol 1, No 01 (2014): November 2014 |
MODEL PEMBELAJARAN EXPERIENTIAL KOLB UNTUK MENINGKATKAN PEMAHAMAN KONSEP SISWA PADA MATA PELAJARAN FISIKA |
Abstract
PDF
|
Eidelweis Dewi Jannati |
|
Vol 7, No 01 (2020): NOVEMBER 2020 |
OPTIMALISASI PROPORSI SUMBER DAYA PROYEK DALAM MENEKAN BIAYA PROYEK KONSTRUKSI |
Abstract
PDF
|
Abdul Kholiq, Lia Lailla Nurjamilah, Arief Rijaluddin |
|
Vol 3, No 2 (2017): Mei 2017 |
PEMBANGKIT LISTRIK METODE PUMP AS TURBINES (PATs) |
Abstract
PDF
|
Asep Rachmat, Ali Hamdani |
|
Vol 6, No 02 (2020): MEI 2020 |
PEMBUATAN ALAT PARUT SEDERHANA UNTUK MEMUDAHKAN PROSES PEMBUATAN KERIPIK PISANG MEREK ANUGRAH DI KECAMATAN BANJARAN |
Abstract
PDF
|
Whydiantoro ., Intan Kusumadewi, Andriyana Pratama, Budiman Budiman |
|
Vol 7, No 01 (2020): NOVEMBER 2020 |
PEMBUATAN ALAT UJI AC JENIS SPLIT ½ PK DENGAN PENAMBAHAN WATER HEATER |
Abstract
PDF
|
Riza M. Yunus, Engkos Koswara, Ferry Aji Anggriawan |
|
Vol 7, No 01 (2020): NOVEMBER 2020 |
PEMBUATAN TUNGKU PELEBURAN ALUMUNIUM DENGAN PEMENFAATAN LIMBAH TEMPURUNG KELAPA SEBAGAI BAHAN BAKAR |
Abstract
PDF
|
Asep Rachmat, Maman Sulaeman |
|
Vol 2, No 02 (2016): Mei 2016 |
PEMBUATAN TUNGKU PEMANAS (MUFLLE FURNACE) KAPASITAS 1200 Celcius |
Abstract
PDF
|
Agus Rizal, Yudi Samantha, Asep Rachmat |
|
Vol 2, No 01 (2015): November 2015 |
PENERAPAN ANALISIS JALUR DALAM MENGANALISIS MODEL HUBUNGAN KAUSALITAS ANTARA DIMENSI RELATIONSHIP MARKETING DENGAN LOYALITAS PELANGGAN |
Abstract
PDF
|
Sri Sustarliyah |
|
26 - 50 of 102 Items |
<< < 1 2 3 4 5 > >> |